检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李雪峰 徐辉 孙晨然 LI Xuefeng;XU Hui;SUN Chenran
机构地区:[1]中国市政华北设计研究总院有限公司,天津市300000
出 处:《城市道桥与防洪》2021年第7期269-271,M0022,共4页Urban Roads Bridges & Flood Control
摘 要:以一个实际工程案例为背景,利用Midas/Civil软件,对3种通道交叉处开洞的处理方式(增设上翻梁和地梁、增设壁柱、不补偿但利用剩余结构局部加配钢筋来抵抗土体荷载效应)进行了分析。通过对板受力情况的改善、地基反力的调整、施工难易性以及经济性方面的比较,得出不补偿但利用剩余结构局部加配钢筋来处理厚板结构开洞是优选方式。Based on a practical engineering case,Midas/Civil software is used to analyze three ways(adding the upturn beam and ground beam,adding the pilaster,and using the local reinforcement of the residual structure to resist the soil load effect without compensation)to deal with the opening at the intersection of channels.Through the improvement of slab stress condition,the adjustment of foundation reaction force,and the comparison of construction difficulty and economy,the optimization way of using the local reinforcement of the residual structure to deal with the opening of the thick plate structure without compensation is obtained.
分 类 号:U449[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.23.26