检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马恒山 马安刚 张斌 施辰安 MA Hengshan;MA Angang;ZHANG Bin;SHI Chenan(Gansu Zhonglian Construction Engineering Technology Co.,Ltd.,Lanzhou Gansu 730070,China)
机构地区:[1]甘肃众联建设工程科技有限公司,甘肃兰州730070
出 处:《工程质量》2021年第7期52-54,68,共4页Construction Quality
摘 要:湿陷性黄土场地上的基桩,在天然含水量状态下做单桩竖向抗压静载荷试验进行承载力验收时,试验最大加载值须根据设计(浸水状态)确定。论文分别对非自重湿陷性和自重湿陷性黄土场地上的基桩,在天然含水量状态下做单桩承载力试验时,对试验最大加载值的确定提出了计算方法。When accepting the bearing capacity of foundation pile in collapsible loess site by single pile vertical compressive static load test under natural water content state,the maximum load value of the test must be determined according to the design(immersion state).In this paper,the calculation method for determining the maximum test load value of foundation piles in collapsible loess with non-self-weight and self-weight under natural water content is presented respectively.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7