切眼巷坚硬顶板钻孔预裂塑性区分析及钻孔参数  被引量:1

Plastic zone analysis and drilling parameters of drilling presplit in hard roof of open-off cut

在线阅读下载全文

作  者:李凡 窦桂东 唐洪 肖飞 LI Fan;DOU Guidong;TANG Hong;XIAO Fei(Shaanxi Binchang Xiaozhuang Mining Group Co.,Ltd.,Binzhou 713500,China;Binchang Mining Area Disaster Comprehensive Control Engineering Research Center,Xianyang 713600,China)

机构地区:[1]陕西彬长小庄矿业有限公司,陕西彬州713500 [2]彬长矿区灾害综合治理工程研究中心,陕西咸阳713600

出  处:《陕西煤炭》2021年第S01期98-101,157,共5页Shaanxi Coal

摘  要:为了解决因支护形成工程坚硬顶板带来的问题,以小庄煤矿40205工作面地质生产条件为研究背景,采用基于复变函数的理论分析、数值模拟、现场实践的方法,分析比较了密集松动预裂岩体钻孔的应力场、位移场和塑性区的分布规律。研究表明:钻孔布设角度增加到一定角度(0°~90°)后与塑性区影响范围成反比;通过现场实践验证,40205工作面经密集卸压钻孔预裂处理后,初次垮落步距都缩短了6 m,保证了工作面的安全生产。In order to solve the problem of engineering hard roof caused by support,taking the geological production conditions of 40205 working face in Xiaozhuang Coal Mine as the research background,the distribution laws of stress field,displacement field and plastic zone of dense pre-splitting boreholes were analyzed and compared by using the methods of theoretical analysis,numerical simulation and field practice.The results show that when the angle of borehole arrangement increases to a certain angle(0°~90°),it is inversely proportional to the influence range of plastic zone.Through the field practice,40205 working face after intensive pressure relief drilling presplitting treatment,the first weighting distance is shortened by 6 m,which can ensure the safe production of the working face.

关 键 词:工程坚硬顶板 密集卸压钻孔 塑性区 初次来压步距 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象