检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何潇 He Xiao(Tacheng District Water Conservancy and Hydropower Survey and Design Institute,Tacheng 834700,Xinjiang)
机构地区:[1]塔城地区水利水电勘察设计院,新疆塔城834700
出 处:《陕西水利》2021年第7期24-26,30,共4页Shaanxi Water Resources
摘 要:西北地区某注入式水库因地质条件所限,库盘透水性好,水库常年渗漏,损失巨大。对水库地质环境进行分析论述,并对库盘表层粉土和卵石混合土进行颗分试验,得到库盘漏水的形式和水量。采用有限元方法对粘土铺盖防渗和复合土工膜防渗两种方案进行二维渗流分析,得到复合土工膜防渗方案在有效降低全库渗流量的同时利于大坝稳定的结论,可为类似工程提供参考。Due to the limited geological conditions,an injection reservoir in the northwest region has good water permeability,and the reservoir leaks all the year round,resulting in huge losses.The geological environment of the reservoir is analyzed and discussed,and the silt and pebble mixed soil on the surface of the reservoir is subjected to a granulation test to obtain the form and volume of water leakage in the reservoir.The finite element method is used to analyze the two-dimensional seepage flow of the clay cover anti-seepage and composite geomembrane anti-seepage schemes,and the conclusion that the composite geomembrane anti-seepage scheme can effectively reduce the seepage flow of the whole reservoir is beneficial to the stability of the dam,which can be similar The project provides reference.
分 类 号:TV62[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15