基于能耗评价的摘挂列车调车作业计划仿真分析  被引量:3

Simulation Analysis of Shunting Operation Schedule Based on Energy Consumption Evaluation

在线阅读下载全文

作  者:谢顺丰 胡留洋 鲁工圆[1,2] 张博健 于涛[3] XIE Shunfeng;HU Liuyang;LU Gongyuan;ZHANG Bojian;YU Tao(School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;School of Traffic and Transportation,Beijing Jiaotong University,Beijing 100044,China)

机构地区:[1]西南交通大学交通运输与物流学院,四川成都610031 [2]西南交通大学综合交通运输智能化国家地方联合工程实验室,四川成都610031 [3]北京交通大学交通运输学院,北京100044

出  处:《铁道运输与经济》2021年第7期72-78,共7页Railway Transport and Economy

基  金:国家自然科学基金高铁联合基金项目(U1834209)。

摘  要:为了制订最优调车作业计划,降低能耗,提升车站工作组织的效率与效益,阐述调车作业计划与能耗计算方法,分析调车钩衔接方式对调车作业能耗的影响,并以能耗为切入点,将调移车辆数和组号内车辆数纳入摘挂列车调车作业计划分析与评价过程,构建基于能耗评价的摘挂列车调车作业计划智能体仿真模型,以实现调车作业计划仿真及评价指标的统计。实验表明,调车钩数、调移车辆数、调车作业方式、组号内车辆数与指标权重均直接影响调车作业计划的能耗和最优调车作业计划的选择,能耗评价能够综合反映以上指标,进而得到最优调车作业计划。To formulate the optimal shunting operation schedule, reduce energy consumption, and improve the efficiency and economic benefit of the station organization, this paper expounded the shunting operation schedule and the calculation method of energy consumption and analyzed the influence of the continuation mode of shunting hooks on the energy consumption of shunting operation. In addition, with energy consumption as the breakthrough, this paper brought the number of wagons transferred and the group indication into the analysis and evaluation process of the shunting operation schedule. The simulation model for the intelligent agents of the shunting operation schedule based on energy consumption evaluation was constructed for the simulation of the shunting operation schedule and the statistics of evaluation indexes. The experimental results show that the number of shunting hooks, the number of wagons transferred, the shunting operation mode, the group indication, and the index weights all have a direct impact on the energy consumption and the selection of the optimal shunting operation schedule. Energy consumption evaluation can reflect the above indexes comprehensively and obtain the optimal shunting operation schedule.

关 键 词:智能体 仿真 摘挂列车 调车作业计划 能耗评价 

分 类 号:U292.3[交通运输工程—交通运输规划与管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象