检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵帅 王立欢 薛鸣鹤 廖金登 戴伟 Zhao Shuai;Wang Li-huan;Xue Ming-he;Liao Jin-deng;Dai Wei
机构地区:[1]中建二局第一建筑工程有限公司,广东深圳518003
出 处:《建筑技术开发》2021年第14期74-75,共2页Building Technology Development
摘 要:人工挖孔桩开始施工前,制订多种施工方案,通过分析人工挖孔桩所处边坡结构内原有框格挡墙概况以及边坡周围建筑物现状,在不破坏边坡内原有挡墙结构且不影响周围建筑物的情况下,选用分层搭设钢管脚手架操作平台的施工方案,提供人工挖孔桩作业面,保证了人工挖孔桩顺利施工,为类似工程提供施工经验。Before construction of artificial dig-hole pile,a variety of construction schemes are developed.By analyzing the original sash retaining wall situation in slope profile structure of the artificial dig-hole pile and surrounding buildings of slope,construction scheme of layered erection of steel pipe scaffold platform is selected without destroying the slope and affecting surrounding buildings,the artificial dig-hole pile operation is provided,the successful construction of artificial dig-hole pile is ensured,which provides construction experience for similar projects.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145