城市桥梁预制构件场的规划布局  

Planning and Layout of Urban Bridge Prefabricated Component Yard

在线阅读下载全文

作  者:陈宁 李江[2] Chen Ning;Li Jiang

机构地区:[1]长沙市城投基础设施建设项目管理有限公司,长沙410004 [2]中铁大桥局集团第五工程有限公司,江西九江332000

出  处:《建筑技术开发》2021年第14期114-116,共3页Building Technology Development

摘  要:随着城市桥梁建设传统工艺的变革,桥梁预制结构类型的增加,对桥梁预制构件场的规划建设提出了更高的要求。以湘府路快速化改造工程的预制构件场的建设为例,结合项目的实际情况,因地制宜地对预制构件场进行规划布局,分别从立柱、盖梁、钢板组合梁生产线的布置要点、设备选型、功能使用、绿色施工等方面进行深入介绍。With change of the traditional technology of urban bridge construction and increase of the type of bridge prefabricated structure,higher requirements are put forward for planning and construction of bridge prefabricated component.With the construction of prefabricated component field of Xiangfu Road rapid transformation project as an example’combined with the actual situation of the project,according to the local conditions of the prefabricated component field planning layout,layout points,equipment selection,function use,green construction and other aspects of column,cap beam-steel plate composite beam production line are introduced deeply.

关 键 词:城市桥梁 预制构件场 规划布局 

分 类 号:TU997[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象