ZH市郊110kV变电站电气一次部分规划设计  

Planning and Design of Primary Electrical Part of 110 kV Substation in Suburbs of ZH

在线阅读下载全文

作  者:晁岱峰 Chao Dai-feng

机构地区:[1]中国电建集团贵州电力设计研究院有限公司,贵州贵阳550002

出  处:《电力系统装备》2021年第11期37-38,共2页Electric Power System Equipment

摘  要:变电系统的自动化升级是社会进步对供电质量的需求。在对供电系统进行自动化升级时不但要考虑技术的可靠性和先进性,还要兼顾其灵活性和经济性。变电站的自动化发展以及建立在一定程度上减少了人力、物力以及财力方面的投入,并且提高了供电的可靠性,保证了供电质量。The automation upgrade of the substation system is the need of social progress for the quality of power supply.When we automatically upgrade the power supply system,we must not only consider the reliability and advancement of its technology,but also take into account its flexibility and economy.The development and establishment of substation automation has reduced the investment of manpower,material resources and fi nancial resources to a certain extent,and has improved the reliability of power supply and ensured the quality of power supply.

关 键 词:110 kV变电站 电气设计 配电装置 避雷设计 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象