检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田利勇 赵玉琢 王怀明 周升明 宪凯 张野 刘亚杰 TIAN Liyong;ZHAO Yuzhuo;WANG Huaiming
出 处:《科技创新与应用》2021年第22期58-60,共3页Technology Innovation and Application
摘 要:基于唐山乐亭菩提岛海上风电场300MW示范工程项目的建设经历,文章对冰区风场建设过程的抗冰与防冰对策进行了讨论。重点比较了油气平台与风机平台抗冰性能,并对安装破冰锥体降低冰力的方案进行了论证。结论表明,是否采用破冰锥体要由开发环境的冰情、结构的抗冰特性等因素决定,提出在寒区风场开展冬季海冰测量与监测的必要性。Based on the construction experience of 300MW demonstration project of offshore wind farm in Leting Bodhi Island,Tangshan,this paper discusses the iceresistance and prevention countermeasures in the process of wind farm construction in ice area.The ice resistance of oil and gas platform is compared with that of fan platform,and the scheme of installing ice breaking cone to reduce ice force is demonstrated.The conclusion shows that whether to adopt the ice-breaking cone or not should be decided according to the ice conditions of the development environment and the ice-resistant characteristics of the structure,and then this paper points out the necessity of measuring and monitoring sea ice in winter in the wind field in cold regions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.192.254