上海沿江通道浦东段工程建设方案与思考  

Construction Schemes&Thoughts of Pudong Section of Shanghai Riverside Channel

在线阅读下载全文

作  者:江洪 JIANG Hong(Shanghai Chengtou Highway InvestmentCo.,Ltd.,Shanghai 200335,China)

机构地区:[1]上海城投公路投资(集团)有限公司,上海200335

出  处:《中国市政工程》2021年第4期4-7,103,共5页China Municipal Engineering

摘  要:沿江通道浦东段工程规模大,建设条件复杂,建成后作为G1503高速公路和上海市市郊环线组成部分,主要服务外高桥港区、洋山港区、自贸区与长三角地区间的货运联系。从匝道布局,桥梁设计、建造、后期运营养护等角度探讨沿江通道浦东段工程的建设方案,总结出一些有用的经验,供后续类似工程参考。The Pudong Section of the Riverside Channel has a large scale&complex construction conditions.After completion,as a part of G1503 Expressway&Shanghai Suburban Ring,it mainly serves the freight connection with Waigaoqiao Port Area,Yangshan Port Area,Free Trade Zone&the Yangtze River Delta.It discusses the construction scheme of Pudong Section of the Riverside Channel from the perspectives of ramp layout,bridge design,construction and later operation&maintenance,and summarizes some useful experience for subsequent similar projects.

关 键 词:沿江通道 国际航运中心 快速化建造 U形盖梁 分片盖梁 运营养护 

分 类 号:U448.14[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象