检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯俊岩 廖剑锋 姜荦荦 刘孟 FENG Junyan;LIAO Jianfeng;JIANG Luoluo;LIU Meng(COOEC Shenzhen Subsea Technology Co.,Ltd.,Shenzhen 518067,Guangdong,China)
机构地区:[1]深圳海油工程水下技术有限公司,广东深圳518067
出 处:《机电设备》2021年第4期80-83,共4页Mechanical and Electrical Equipment
摘 要:文章介绍某FPSO船用发电机的大修过程,主要叙述了设备解体后,对定子及转子绕组进行各项检查,发现重大缺陷,确定需要重新制作并更换定子及转子绕组。此外又介绍了发电机在大修过程中所需要进行的各项试验项目。The overhaul process of a FPSO marine generator is introduced.It is determined that the stator and rotor windings need to be rebuilt and replaced after the dismantlement of the equipment,in which major defects are found.After discovering the major defects,it is determined that the stator and rotor windings need to be rebuilt and replaced.In addition,test items that need to be carried out during the overhaul process of the generator is introduced.
分 类 号:U664.142[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.204.151