基于便梁线路加固的桩顶荷载计算研究  被引量:1

Research on the Calculation of Pile top Load Based on the Reinforcement of the Auxiliary Beam Line

在线阅读下载全文

作  者:陈凰琴 Chen Huangqin(Nanchang Railway Survey and Design Institute Co.Ltd.,Nanchang,Jiangxi 330002)

机构地区:[1]南昌铁路勘测设计院有限责任公司,江西南昌330002

出  处:《江西建材》2021年第7期70-71,共2页Jiangxi Building Materials

摘  要:文中以南昌某条市政道路下穿铁路专用线框架桥为工程实例,依据铁路规范对框架桥在顶进过程中便梁线路加固的桩顶荷载进行计算、组合,得出了起控制作用工况的桩顶荷载组合,计算了桩基竖向承载力,并简要阐述了桩基的验算内容。In this paper, a municipal road in Nanchang passes through a special railway frame bridge as an engineering example. According to the railway code, the pile top load of the beam line reinforcement during the jacking process of the frame bridge is calculated and combined, and the control engineering is obtained. The pile top load combination under the actual conditions, the vertical bearing capacity of the pile foundation is calculated, and the check calculation content of the pile foundation is briefly explained.

关 键 词:框架桥 顶进 便梁 线路加固 荷载组合 承载力 

分 类 号:TU997[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象