检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄民 赵东生[1,2] HUANG Min;ZHAO Dongsheng(Shandong Provincial Lunan Geo-engineering Exploration Institute,Jining Shandong 272100,China;Shandong Provincial Hualu Engineering Corporation,Jining Shandong 272100,China)
机构地区:[1]山东省鲁南地质工程勘察院,山东济宁272100 [2]山东省华鲁工程总公司,山东济宁272100
出 处:《地质装备》2021年第4期46-48,共3页Equipment for Geotechnical Engineering
摘 要:目前地下连续墙施工多采用双轮铣槽机进行施工。地下连续墙的成槽垂直度为施工中极其重要的技术指标,在基岩层施工中往往垂直度很难控制。笔者结合地连墙施工经验,对基岩段成槽垂直度的控制和修正进行了简单分析,并提出了一些施工建议。At present,the construction of underground diaphragm wall is mostly carried out by two-wheel slot milling machine,in which slotting verticality is an extremely important technical index and it is often difficult to control the verticality in bedrock construction.Combined with the construction experience of diaphragm wall,the authors briefly analyse the verticality control and correction in the bedrock construction,and put forward some suggestions during construction.
分 类 号:TU67[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222