检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹伟[1] YIN Wei(Beijing Construction Engineering Group Co.,Ltd.,100055,Beijing,China)
出 处:《建筑技术》2021年第8期926-930,共5页Architecture Technology
摘 要:北京地铁17号线望京西站-勇士营站区间暗挖横通道下穿2条高压燃气管,施工中根据现场监测结果,分析在富水敏感地层中暗挖大断面隧道施工对燃气管线的影响,对沉降超标的管线采取隔离措施进行2次保护,确保了大断面隧道顺利穿越燃气管线。Two high-pressure gas pipes passes underneath the underground excavated cross passage between Wangjingxi Station and Yongshiying Station of Beijing Metro Line 17.According to on-site monitoring results,impact of construction of undergound excavated large cross section tunnel in the water-rich sensitive stratum on the gas pipeline is analyzed,isolation measures for secondary protection of pipelines with excessive settlement are taken to ensure the large cross-section tunnel passes through the gas pipeline smoothly.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.25.53