河坞大闸除险加固工程经济评价  被引量:1

Economic Evaluation of Hazard Removal and Reinforcement Project of Hewu Sluice

在线阅读下载全文

作  者:蔡海龙 CAI Hailong(Xincai Hewu Hydropower Project Management Station,Xincai 463500,China)

机构地区:[1]新蔡县河坞水电工程管理站,河南新蔡463500

出  处:《河南水利与南水北调》2021年第4期93-95,共3页Henan Water Resources & South-to-North Water Diversion

摘  要:河坞大闸枢纽工程运行已45年,存在诸多安全隐患,为消除险情隐患,在老河坞闸下游兴建新河坞大闸,并拆除老河坞闸。新河坞闸工程进行了经济评价,分析了工程运行费、工程效益,得出了经济内部收益率、经济净现值、经济效益费用比,并对工程进行了敏感性分析、财务分析。The Hewu Sluice Project has been in operation for 45 years. There are many safety hazards in the project. In order to eliminate the hidden dangers,a new Hewu sluice was built downstream in place of the old sluice. The economic evaluation of the new Hewu Sluice Project is carried out. The project operation cost and project benefit are analyzed. The economic internal rate of return,economic net present value and economic benefit cost ratio are obtained through the analysis. The sensitivity analysis and financial analysis of the project are also conducted in this paper.

关 键 词:河坞大闸 经济评价 工程费用 工程效益 敏感性分析 财务分析 

分 类 号:TV51[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象