检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑天立 ZHENG Tian-li(CCRC International Co.,Ltd.,Beijing 100855,China)
出 处:《水运工程》2021年第8期61-66,共6页Port & Waterway Engineering
摘 要:由于地质条件复杂,罗源湾北岸2×5万吨级码头结构选型较为困难。为了解决此问题,对类似地质条件下的码头结构展开了调研和对比分析,进行码头结构方案优选。从技术可行性和经济合理性角度,对优选的透空式前板桩高桩码头结构进行分析。同时收集了码头实测数据,并与计算结果进行对比,从而验证了透空式前板桩高桩码头结构的可靠性和经济合理性。Due to the complex geological condition, it has a great difficulty to select the structure for the 2×50,000 DWT wharf in Luoyuan bay. To tackle this problem, research and comparative analysis of the wharf structure under similar geological conditions are carried out, and the structure scheme of the wharf is optimized. From the perspectives of technical feasibility and economic rationality, the optimal high piled wharf with the top opened frontal steel sheet pile structure is analyzed.At the same time, the measured data of the on-site survey and operation parameters of the completed wharf are collected and compared with the calculated results, thus verifying the reliability and economic rationality of the structure of the pile high piled wharf with top opened frontal steel sheet piles.
分 类 号:U656.111[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147