作 者:王立新[1,2] 施王帅胤 徐硕硕 范飞飞 唐琨杰 WANG Lixin;SHI Wangshuaiyin;XU Shuoshuo;FAN Feifei;TANG Kunjie(China Railway First Survey and Design Institute Group Co.Ltd.,Xi’an 710043,China;School of Civil Engineering and Architecture,Xi’an University of Technology,Xi’an 710048,China;School of highway,Chang’an University,Xi’an 710064,China)
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043 [2]西安理工大学土木建筑工程学院,西安710048 [3]长安大学公路学院,西安710064
出 处:《铁道建筑》2021年第8期68-72,共5页Railway Engineering
基 金:国家自然科学基金(52078421);陕西省“特支计划”青年拔尖人才(陕组通字〔2018〕33号);中铁第一勘察设计院集团有限公司科研项目(院科19-42-01)。
摘 要:以西安一地铁区段附近地铁车站基坑开挖为工程背景,建立三维有限元模型,对基坑卸荷开挖进行动态模拟,分析开挖过程中既有隧道结构的变形规律,探究保证隧道结构稳定的加固措施。结果表明:基坑卸荷完成后,近基坑隧道结构变形较大,且竖向变形远大于水平变形,施工过程中应重点监测管片竖向变形;基坑底板的竖向位移变化速率和位移均较大,须加强监测并采用控制措施限制坑底土体的回弹变形;采用环向管幕和抗浮锚索综合加固措施,在基坑全部卸荷完成后,隧道隆起最大值为9.68 mm,水平位移最大值为1.92 mm,满足隧道变形控制标准,变形控制效果显著。Taking the foundation pit excavation of a subway station near a subway section in Xi’an as the engineering background,a three-dimensional finite element model was established to dynamically simulate the foundation pit excavation and unloading,analyze the deformation laws of the existing tunnel structure in the excavation process,and explore the control and reinforcement measures to ensure the stability of the tunnel structure.The results show that after the unloading of the foundation pit,the deformation of the tunnel structure near the foundation pit is large,and the vertical deformation is much larger than the horizontal deformation.The vertical deformation of the segment should be monitored during the construction process.The change rate of the vertical displacement and displacement of the foundation pit bottom plate are large,so it is necessary to strengthen the monitoring and adopt control measures to limit the rebound deformation of the soil at the bottom of the pit.The comprehensive reinforcement control measures of circumferential pipe curtain and anti-floating anchor cable are adopted.After the foundation pit is fully unloaded,the maximum uplift of the tunnel is 9.68 mm and the maximum horizontal displacement is 1.92 mm,which meets the tunnel deformation control standard,and the deformation control effect is remarkable.
关 键 词:地铁隧道 变形规律 数值模拟 基坑卸荷 环向管幕 抗浮锚索 综合加固措施