丰宁水电站混凝土面板砂砾石坝内部观测施工  

Internal Observation and Construction of Concrete Face Gravel Dam of Fengning Hydropower Station

在线阅读下载全文

作  者:杜岩 蔡威博 侯帅 DU Yan;CAI Wei-bo;HOU Shuai(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2021年第8期112-114,共3页Yunnan Water Power

摘  要:根据丰宁水电站混凝土面板砂砾石坝高程1025m层和1040m层水管式沉降仪和引张线的施工,得出了在土石坝中广泛采用的、传统的坑槽式埋设方法已不适应现代砂砾石混凝土面板坝施工的结论,而水管式沉降仪和引张线的施工是采用在填筑面上直接埋设,不用开挖坑槽,简单易行,便于操作的施工方法。According to the construction of water tube settlement meter and tension line for 1025m and 1040m floors of concrete face slab sand-gravel dam of Fengning Hydropower Station,it is concluded that the traditional pit-and-trough embedment method widely used in earth-rock dam is no longer suitable for the construction of modern sand-gravel concrete face dam.Water tube settler and tension line can be directly buried on the filling surface without excavating the pit and trench.It is a simple and convenient construction method.

关 键 词:混凝土面板砂砾石坝 水管式沉降仪和引张线 坑槽法 平铺法 施工 

分 类 号:TV547[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象