检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:喻虎圻 肖志愿 蒋庆仁 YU Hu-qi;XIAO Zhi-yuan;JIANG Qing-ren(Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵阳550081
出 处:《广西水利水电》2021年第4期59-63,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:介绍了南昌市儒乐湖项目的工程概况。根据儒乐湖闸的水文及布置特点,拟定水闸过流能力的计算方法,并分析该计算结果。结果表明,闸上管廊对水流过流形态及过流能力影响显著,低水位呈平底闸过流特性,高水位呈隧洞有压流过流特性。该方法可为同类复杂边界条件水闸过流能力计算提供参考。An introduction was made on the general information of Rule Lake project in Nanchang City.The calculat⁃ing method of gate discharge capacity was determined according to the hydrological and layout characteristics of Rule Lake gate.The calculation results were analyzed and demonstrate the pipe gallery above the gate has signifi⁃cant impact on the flow pattern and discharge capacity.At low water level,it shows the flow characteristics of flat bottom gate.At high water level,it shows the flow characteristics of pressure flow in tunnel.This method may be ad⁃opted for discharge capacity calculation of gate with similar boundary conditions.
分 类 号:TV132.1[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.107.92