检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈韶光[1] 李兼伐 陈炳森[1] 胡华丽[1] CHEN Shao-guang;LI Jian-fa;CHEN Bing-sen;HU Hua-li(Guangxi Hydraulic and Electric Polytechnic,Nanning 530023,China)
出 处:《装备制造技术》2021年第7期245-247,257,共4页Equipment Manufacturing Technology
摘 要:针对明秀水电站存在的机组超期服役、设备老化、性能下降等问题,结合电站的基本参数,提出了水轮发电机组的改造方案。通过方案比较,优选了效率最高的水轮机转轮方案,确定了发电机改造措施。项目改造效果明显,达到了增效改造目标,实现了水轮发电机组的再制造。Aiming at the problems of extended service,equipment aging and performance degradation of units in Mingxiu hydropower station,combined with the basic parameters of the power station,the transformation scheme of water turbine generator unit is put forward.Through scheme comparison,the runner scheme with the highest efficiency is optimized,and the generator transformation measures are determined.The transformation effect of the project is obvious,the goal of efficiency improvement is achieved,and the remanufacturing of water turbine generator unit is realized.
分 类 号:TV738[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145