检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马绍益 李星梅[1] 李金孟 MA Shao-yi;LI Xing-mei;LI Jin-meng(School of economics and Management,North China Electric Power University,Beijing 102206,China)
机构地区:[1]华北电力大学经济与管理学院,北京102206
出 处:《中国管理科学》2021年第8期106-115,共10页Chinese Journal of Management Science
基 金:国家自然科学基金资助项目(71772060)。
摘 要:许多现有的项目组合模型都认为项目集合可以在固定的计划期完成,但是在实际的项目执行过程中,决策者为了使得高收益的项目纳入项目集合中或者放弃风险高的项目来释放更多的资金,会选择对项目组合固定的计划期进行灵活性调整。同时,考虑到项目未来价值的不确定性,本文利用实物期权的二叉树模型给出了价值波动的公式,进而建立了同时受弹性时间段和价值波动影响的项目组合选择的新模型,对传统的计算项目价值的净现值法进行补充。通过GAMS/BARON对算例进行求解,验证了模型的合理性和有效性。结果表明:考虑弹性时间段和价值波动的影响会给更符合企业长期的发展战略,给企业带来更大的收益,该模型也为处理不确定情况下的项目组合问题提供了新思路和新方法。Due to the shortage of resources,project managers are more and more eager to carry out multiple projects in parallel in a limited time and resource range in order to obtain higher benefits.However,there will be a high degree of uncertainty in the parallel development of many projects,which will affect the development of enterprises.The existing project portfolio models all think that the project set can be completed in a fixed planning period,but in the actual project implementation process,the decision makers often adjust the length of the planning period reasonably according to the actual situation,extended the planning period so that the high-yield projects can be included in the project set or shorten the planning period as much as possible to give up the risky projects and release more funds.Therefore,the flexible time horizon is brought into the project portfolio selection model.At the same time,considering that the value of the project will change with time,for the uncertainty of the future value of the project,the binary tree model of real options is used to define the formula of value fluctuation and a new model of project portfolio selection affected by flexible time horizon and value fluctuation is established at the same time,and the traditional net present value method(NPV)is complemented for calculating project value.In the part of case analysis,a set of data is randomly generated,and the rationality and effectiveness of the model are proved by using GAMS/BARON through the comparative analysis of four kinds of scenes.In order to further illustrate the practical application of the model,this paper applies the model to acrylic factory to optimize the alternative project of the factory and schedule the production schedule in the next month.The results show that considering the influence of value fluctuation and flexible time horizon will be more in line with the long-term development strategy of enterprises and bring greater benefits.The model also provides a new idea and method for dealing with the pr
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.29.162