质量管理与工程造价控制刍议  被引量:3

Argumentation About Quality Management and Cost Control

在线阅读下载全文

作  者:李敬升 LI Jingsheng(China Railway Construction Group Co.Ltd.,Beijing 100040,China)

机构地区:[1]中铁建设集团有限公司,北京100040

出  处:《铁道建筑技术》2021年第8期175-178,共4页Railway Construction Technology

基  金:中铁建设集团有限公司科技研究项目(19-30c)。

摘  要:全过程质量管理和造价控制是相互联系、相互制约、和谐统一的辩证关系。二者都需要经历投资决策、设计、施工、运营维护各个阶段。投资方功能需求是决定造价水平的根本源头;设计文件需兼顾工程品质和工程造价;工程造价确定应以确保各阶段任务实施质量为前提。遵循市场规律,择优选定高素质施工单位,合理界定风险范围,规范签订合同。施工阶段充分发挥监理、第三方检测部门作用,严控变更增量费用;合同双方诚信履约,做到工程质量与造价控制全面统一。The whole process quality management and cost control are dialectical relationships that are interrelated,restricted and harmoniously unified. Both of them need to go through various stages of investment decision-making,design,construction,operation and maintenance. The functional needs of investors are the fundamental source of determining cost level of the project. The design documents need to consider the quality and the cost of the project. The determination of the cost of the project should be premised on quality of task implementation at all stages,following the market law,selecting high-quality construction units on merit,reasonably defining the scope of risk,and standardizing the signing of general contracts. The construction phase will give full play to the role of supervision and third-party testing departments,strictly controlling the incremental costs of changes,and the parties to the contract shall perform their contracts in good faith. So that the project quality and cost control can achieve the overall unity.

关 键 词:设计质量 施工阶段造价控制 合同履约障碍 

分 类 号:TU723.3[建筑科学—建筑技术科学] TU712.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象