检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏福海 赵华民 戴昌 王勇 WEI Fuhai;ZHAO Huamin;DAI Chang;WANG Yong(Anhui Masteel Luohe Mining Co.,Ltd;Shcool of Civil and Resources Engineering,University of Sci-ence and Technology Beijing)
机构地区:[1]安徽马钢罗河矿业有限责任公司,安徽省合肥市230001 [2]北京科技大学土木与资源工程学院
出 处:《现代矿业》2021年第8期146-149,共4页Modern Mining
摘 要:为了实现罗河铁矿全尾砂的高效、低成本、环保絮凝沉降,进行了全尾砂静态絮凝沉降、动态絮凝沉降特性研究,确定了合适的絮凝剂、充填料浆浓度、絮凝剂单耗等。认为现场所用絮凝剂较理想、单耗为15 g/t,料浆浓度宜为10%~15%,对应的静态沉降极限浓度为59.83%,动态絮凝沉降4 h对应的动态极限浓度为69.16%,比静态沉降极限浓度提升9.33个百分点。To achieve a high-efficient,low-cost and environmentally-friendly flocculated thickening process in Luohe Iron Mine,a set of settling tests,including batch settling test and dynamic settling tests,were carried out to determine the optimal flocculant type,slurry concentration,and flocculant dosage,etc.Results show that the flocculant being applied in the mine is ideal as the flocculant dosage is 15 g/t and the slurry concentration is 10%~15%.The obtained maximum concentration in the batch settling test is 59.83%.In addition,the maximum concentration in the dynamic settling test is 69.16%,which is 9.33 per⁃centage points higher than that of the batch settling test.
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188