某铅锌矿地压活动数值模拟及防控措施  被引量:2

Numerical Simulation and Control Measures of Ground Pressure Activity in a Lead-zinc Mine

在线阅读下载全文

作  者:张贤 袁子清 李旺 于世波 王平 ZHANG Xian;YUAN Ziqing;LI Wang;YU Shibo;WANG Ping(Chihong Technology Engineering Co.,Ltd.;BGRIMM Technology Group Co.,Ltd.;National Center for International Joint Research on Green Metal Mining)

机构地区:[1]驰宏科技工程股份有限公司,云南省曲靖市655011 [2]矿冶科技集团有限公司 [3]国家金属矿绿色开采国际联合研究中心

出  处:《现代矿业》2021年第8期208-211,共4页Modern Mining

摘  要:基于某铅锌矿地下开采技术条件与现场地压活动情况,采用PHASE2软件对矿山典型地质剖面进行二维数值模拟与分析,探究由开采活动引起的地压活动规律。研究发现:不同矿体之间的天然隔离矿柱是应力集中最明显的区域,且上盘45°方向的移动变形量最大。据此,提出了有针对性的地压防控措施,为矿山未来地压监测系统建设及地质灾害防控提供参考。Based on the underground mining technical conditions and field ground pressure activities of a lead-zinc mine,two-dimensional numerical simulation and analysis of typical geological sections of the mine were carried out by PHASE2 software to explore the law of ground pressure activities generated by mining activities.It is found that the natural isolated pillars between different ore bodies are the areas with the most obvious stress concentration,and the moving deformation in the 45°direction of the upper plate is the largest.Accordingly,targeted ground pressure prevention and control measures are put forward to pro⁃vide reference for the construction of mine future ground pressure monitoring system and the control of geo⁃logical disasters.

关 键 词:数值模拟 地压活动 安全监测 防控措施 

分 类 号:TD32[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象