检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘阳飞 曾沙 曾水根 郎黔 Liu Yangfei;Zeng Sha;Zeng Shuigeng;Lang Qian(Manufacture Management Department,Shougang Shuicheng Iron&Steel(Group)Co.,Ltd,.Liupanshui 553028,Guizhou,China;Industrial Department of Iron Making and Coking,Shougang Shuicheng Iron&Steel(Group)Co.,Ltd,.Liupanshui 553028,Guizhou,China)
机构地区:[1]首钢水钢制造管理部 [2]首钢水钢铁焦事业部,贵州六盘水553028
出 处:《水钢科技》2021年第3期32-34,43,共4页Shuigang Science & Technology
摘 要:水钢公司三高炉在2021年3月28日开始的年修期间休风120 h,通过前期优化休复风方案,合理控制各项操作参数,复风60小时后,主要经济技术指标恢复至正常冶炼水平,本文对此次休风及炉况恢复进行总结,为今后长期休风提供借鉴。No.3 blast furnace of Shuigang had been blown out for 120 h during annual repair since March 28,2021.By optimizing the programs of blowing-out and blowing-in of the blast furnace in the early stages and controlling various operation parameters reasonably,the main economic and technical indexes recovered to the normal iron-making level after 60 h since the blowing-in.In this article,the blowing-out and blowing-in are summarized to provide reference for long-term blowingout in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.179.20