检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏万勇 邢泽庆 Wei Wan-yong;Xing Ze-qing
机构地区:[1]甘肃第一建设集团有限责任公司,兰州730050
出 处:《建筑技术开发》2021年第16期157-158,共2页Building Technology Development
摘 要:结合位于潍坊市辛冬安置区棚改项目(一期工程)的地基施工过程,简单分析了施工的技术设计,重点介绍弱膨胀土天然地基施工前的勘探设计、过程操作及质量保证措施。实践表明:该技术主要应用于弱膨胀土地区,可提高基底清槽质量,且具有施工方便,施工周期短等优点。The technical design of the construction is mainly analyzed based on foundation construction process of shed reform project(phase I project)in Xindong resettlement area,Weifang City,and the exploration design,process operation and quality assurance measures before construction of natural foundation of weak expansive soil are focused.The practice shows that the technology is mainly used in weak expansive soil area,which can improve quality of foundation trench cleaning,and has convenient construction and shortened construction period.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7