检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yu Wu Jing Tao Jiehao Wang Yan Zhang Shuhua Peng
机构地区:[1]State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Xuzhou 221116,China [2]School of Mechanical Engineering,Sichuan University of Science and Engineering,Zigong 643000,China [3]School of Mechanics and Civil Engineering,China University of Mining and Technology,Xuzhou 221116,China [4]Chevron Technical Center,Houston 77002,USA
出 处:《International Journal of Mining Science and Technology》2021年第4期611-620,共10页矿业科学技术学报(英文版)
基 金:This work was supported by the National Natural Science Foundation of China(No.51674247);the project for Fundamental Research Funds for the Central Universities(China University of Mining and Technology)under No.2015XKZD06.
摘 要:Cryogenic fracturing with liquid nitrogen(LN_(2))offers the benefits of reducing the water consumption and adverse environmental impacts induced by water-based fracturing,as well as potentially enhancing the fracture complexity.We performed a series of laboratory experiments to explore the key mechanisms governing the breakdown pressures of shale during cryogenic fracturing.In this study,cylindrical shale samples were pre-conditioned by exposing a borehole to low-temperature LN_(2) for a certain time period,and then,the samples were fractured using gaseous N_(2) under triaxial stress and a high reservoir temperature.The effects of various key parameters on the breakdown pressure were investigated,including the duration of the low-temperature LN_(2) treatment,the confining pressure,the reservoir temperature,and the direction of the shale bedding relative to the borehole axis.The results demonstrate that the injection of low-temperature LN_(2) as a pre-fracturing fluid into a borehole can significantly reduce the breakdown pressure of the shale during subsequent nitrogen fracturing.This reduction in breakdown pressure can be further intensified by increasing the duration of the LN_(2) pre-conditioning.Without LN_(2) pre-conditioning,the breakdown pressure initially increases and then decreases with increasing reservoir temperature.When LN_(2) pre-conditioning is applied,the breakdown pressure keeps decreasing with increasing reservoir temperature.As the confining pressure increased,the breakdown pressure increased linearly in the tests with and without LN_(2) pre-conditioning.The experimental results demonstrate that LN_(2) preconditioning before N_(2) fracturing is a promising waterless fracturing technique that reduces the breakdown pressure and enhances the fracture complexity.
关 键 词:Breakdown pressure Liquid nitrogen(LN_(2))pre-conditioning Nitrogen(N2)fracturing Thermal shock
分 类 号:TE37[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.85.192