检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴俊杰 Wu Junjie(Dayun Huasheng Nangou Coal Industry Co.,Ltd.,Ningwu Shanxi 036700)
机构地区:[1]大运华盛南沟煤业有限公司,山西宁武036700
出 处:《机械管理开发》2021年第8期83-84,86,共3页Mechanical Management and Development
摘 要:对平衡式隧道掘进机的机械化支护系统进行可靠性、可维护性分析。分析结果表明,机械化支护系统的三个子系统在超过89%的时间内都是可用的。为了提高系统的可靠性,需要对各个子系统进行预防性维护。根据得到的结果,子系统臂举、支腿和转台的80%可靠性级别的基于可靠性的预防性维修时间间隔分别为180 d、120 d和360 d。The reliability and maintainability analysis of the mechanized support system of balanced tunnel tunneling machine. The analysis results show that all three subsystems of the mechanized support system are available for more than 89% of the time. To improve the reliability of the system, preventive maintenance of the various subsystems is required. Based on the obtained results, the reliability-based preventive maintenance intervals of 80% reliability levels of the subsystem arm lift, leg, and turntable were 180 days, 120 days and 360 days, respectively.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117