检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李晓卫[1] 邱家友[1] 黄军强[1] 李伶东[1] 吕磊[1] LI Xiaowei;QIU Jiayou;HUANG Junqiang;LI Lingdong;LV Lei(Oil Production Plant 1 of PetroChina Changqing Oilfield Company,Yan'an Shaanxi 716000,China)
机构地区:[1]中国石油长庆油田分公司第一采油厂,陕西延安716000
出 处:《石油化工应用》2021年第8期62-64,共3页Petrochemical Industry Application
摘 要:安塞油田勘探开发近40年,随着开发时间延长,套损加剧,影响产能发挥。为此,分析研究套管腐蚀机理,针对性的开展二次固井水泥体系优选、挤注工艺优化,在产能恢复、提高水泥返高方面效果明显,达到长效治理目的,为其他同类套损治理提供了借鉴和指导。In recent 40 years of exploration and development in Ansai oilfield,with the extension of development time,the casing damage is aggravating,which affects the production capacity.Therefore,by analyzing and studying the mechanism of casing corrosion,the optimization of secondary cementing cement system and squeeze injection process is carried out.The effect is obvious in productivity recovery and cement return height improvement,and the purpose of long-term treatment is achieved,which provides reference and indicators for other similar casing damage treatment.
分 类 号:TE256.7[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.145.78