罗源湾2×5万吨级码头前板桩结构变形计算  被引量:1

Calculation for deformation of frontal sheet piles of 2×50,000 DWT wharf in Luoyuanwan Bay

在线阅读下载全文

作  者:郑天立 ZHENG Tian-li(CCRC International Co.,Ltd.,Beijing 100855,China)

机构地区:[1]中国铁建国际集团有限公司,北京100855

出  处:《水运工程》2021年第9期55-59,共5页Port & Waterway Engineering

摘  要:罗源湾2×5万吨级泊位采用前板桩高桩码头结构,这是一种较为复杂的混合结构。为了确保码头结构可靠性,前板桩结构变形计算采用了空间杆系有限元和平面应变有限元两种方法。介绍了两种计算方法的关键参数取值和前板桩变形计算结果,并将计算结果与变形实测数据进行了比较,从而验证了了两种计算方法关键参数取值的合理性。The marine structure of 2×50,000 DWT wharf in Luoyuanwan Bay adopts a high piled structure with frontal sheet piles,which is a kind of complicate hybrid structure.In order to guarantee the structure s reliability,space member system and plane strain finite element model is applied for the computing the deformation of the frontal sheet pile.The key parameter values of the two calculation methods and the calculation results of the frontal sheet pile deformation are introduced,and the calculation results are compared with the actual deformation data,which verifies the rationality of the key parameters of the two calculation methods.

关 键 词:前板桩高桩码头 空间杆系 平面应变 有限元 

分 类 号:U656.111[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象