检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹万林[1] 杨兆源 魏海丰 张广亮 章俊华 殷飞[1] CAO Wanlin;YANG Zhaoyuan;WEI Haifeng;ZHANG Guangliang;ZHANG Junhua;YIN Fei(Faculty of Architecture,Civil and Transportation Engineering,Beijing University of Technology,Beijing 100124,China;CCCC Fourth Highway Engineering Co.,Ltd.,Beijing 100022,China)
机构地区:[1]北京工业大学城市建设学部,北京100124 [2]中交第四公路工程局有限公司,北京100022
出 处:《施工技术(中英文)》2021年第13期143-147,153,共6页Construction Technology
基 金:中国交建科技研发重大项目(2019-ZJKJ-21);住建部科学技术计划项目(2019-K-100)。
摘 要:提出一种新型装配式悬挑轻钢模架施工平台体系,该新型施工平台由轻钢模架支撑系统、轻钢模架与剪力墙连接系统以及模架施工平台防护系统构成。轻钢模架支撑系统采用轻型方钢管三角桁架结构,长细比较大的压弯杆件采用局部钢管混凝土加强构造。采用高强螺栓附墙节点作为轻钢模架与剪力墙连接系统,将施工平台体系与装配式剪力墙相连。模架施工平台防护系统由脚手架框架以及施工模板平台构成。所提出的新型施工平台体系结构设计合理,支撑系统以及节点构造牢固可靠,工业化与装配化程度高,特别适用于装配式剪力墙结构的建造、设备安装以及外墙装饰等工程。A new prefabricated trussed bracing cantilever light steel construction platform is proposed. The construction platform is composed of light steel bracing system, wall-attached joints system and safety enclosure system. The light steel bracing system adopted the square steel tube triangle trusses, the local concrete-filled steel tube is used to strengthen the bending bar with large slenderness ratios. The light steel bracing system was connected with the prefabricated shear wall through wall-attached joints by high-strength bolts. The safety enclosure system was consisted of scaffold frame and construction forms. The new prefabricated trussed bracing cantilever light steel construction platform has the advantages of reasonable structure design, reliable bracing system and joint structure, high degree of industrialization and assembly. The new construction platform is especially suitable for prefabricated shear wall structures, equipment installation, and exterior wall decoration.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38