TB水电站泄洪系统金属结构设备布置  被引量:1

Layout of Metal Structure Equipment of Flood Discharge System in TB Hydropower Station

在线阅读下载全文

作  者:张文科 周华 胡彩石 陈辉春 ZHANG Wenke;ZHOU Hua;HU Caishi;CHEN Huichun(Huaneng Lancangjiang Hydropower Co., Ltd., Kunming 650214,China;PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,China)

机构地区:[1]华能澜沧江水电股份有限公司,昆明650214 [2]中国电建集团中南勘测设计研究院有限公司,长沙410014

出  处:《西北水电》2021年第4期61-64,68,共5页Northwest Hydropower

摘  要:简要介绍了TB水电站泄洪系统金属结构设备的整体布置、设计及运行方式。从控制投资、优化设计的角度考虑,对坝顶门机的不同轨距布置方案进行了比较分析;通过对泄洪系统金属结构设备的安装、运行和维护的综合比较,优化了整体布置,使金属结构设备布置更为合理紧凑,总体工程投资减少。The overall layout,design and operation mode of the metal structure equipment of flood discharge system in TB hydropower station are briefly introduced.From the perspective of investment control and design optimization,different gauge layout schemes of the dam crest crane are compared and analyzed;through comprehensive comparison of installation,operation and maintenance of the metal structure equipment of the flood discharge system,the overall layout is optimized to realize reasonable and compact layout of the metal structure equipment,and reduced overall project investment.

关 键 词:金属结构 闸门 启闭机 设计优化 

分 类 号:TV34[水利工程—水工结构工程] TV7

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象