大黑汀水库河床电站5号机组支持盖裂纹隐患处理  

Treatment of Hidden Dangers of Cracks in Support Cover of No.5 Unit of Daheiting Reservoir Riverbed Hydropower Station

在线阅读下载全文

作  者:齐津安[1] 周涛 周世虎[1] QI Jinan;ZHOU Tao;ZHOU Shihu(Luanhe River Diversion Project Management Bureau, Haihe River Water Conservancy Commission, MWR, Qianxi,Hebei 064300,China)

机构地区:[1]水利部海委引滦工程管理局,河北迁西064300

出  处:《西北水电》2021年第4期75-78,共4页Northwest Hydropower

摘  要:大黑汀水库河床电站5号机组为1978年产品,1985年投入运行至今已运行30多年。现发现支持盖裂纹,严重影响机组安全运行,存在较大安全隐患。通过本次现场更新支持盖,改造处理了转轮密封、导叶刚性密封,解决了水轮机转轮渗漏油、导叶密封等问题,确保了机组安全稳定运行,取得了良好的经济效益。The No.5 unit of Daheiting Reservoir Riverbed Hydropower Station was manufactured in 1978.It was put into operation in 1985 and has been in operation for more than 30 years.Cracks has been found on the support cover which have seriously affected the safe operation of the unit,and there is potential safety hazard.Through the on-site renewal of the support cover,the runner seal and the rigid seal of the guide vane have been renovated,and the problems of oil leakage and guide vane sealing of the turbine runner have been solved,which guarantees the safe and stable operation of the unit and achieves good economic benefits.

关 键 词:水轮机 支持盖裂纹 转轮密封 导叶密封 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象