检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙智慧 杨光芒 薛文东[3] Sun Zhihui;Yang Guangmang;Xue Wendong(Huaxi Technology Group,Gongyi 451250,Henan;International Research Center for Blast Furnace Longevity,Beijing 100083;Beijing University of Science and Technology,Beijing 100083)
机构地区:[1]华西科技集团,河南巩义451250 [2]高炉长寿国际研究中心,北京100083 [3]北京科技大学,北京100083
出 处:《河北冶金》2021年第8期42-46,共5页Hebei Metallurgy
摘 要:介绍了某1 080 m^(3)高炉炉型的特点,针对炉役后期冷却壁镶砖脱落、蛇形管外露、操作炉型不规则、炉况顺行难以改善的情况,进行了3次本体喷涂造衬修复操作。重点介绍了第三次喷涂造衬情况,以刚玉莫来石、刚玉碳化硅为喷涂料,采用机械手热喷工艺,喷涂复产后炉型恢复,炉况稳定,燃料比下降了49 kg/t,产量提高到3 723 t,达到了预期效果。The characteristics of 1 080 m^(3) blast furnace are introduced. In view of the tiles dropping of cooling w all,exposure of coiler,irregular operation furnace shape and difficult improvement of furnace condition in the later stage of furnace service,three times of body spraying,lining and repairing operations are carried out. The third spraying lining making is mainly introduced. Corundum mullite and corundum silicon carbide are used as spraying coatings,and the manipulator thermal spraying process is adopted. After spraying and resuming production,the furnace shape is restored and the furnace condition is stable. So,the fuel ratio is reduced by 49 kg/t and the output is increased to 3 723 t,w hich has achieved the expected effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200