作 者:邵志兵 叶文启 SHAO Zhibing;YE Wenqi(Zhongtian Construction Group Co.,Ltd.,Hangzhou,Zhejiang 310008,China)
出 处:《建筑施工》2021年第8期1473-1475,共3页Building Construction
摘 要:针对装配式框架结构主次梁节点不同的连接做法,着重分析了主次梁均预制情况下的主梁预留后浇槽口及次梁预留后浇段这2种形式的节点做法与施工工艺,以及主梁现浇而次梁预制情况下的施工工艺,研究做法的特点及施工上的难点问题,并提出解决措施,以保证所应用项目上主次梁施工的顺利进行。As to the different connection methods of the main and secondary beam joints of the prefabricated frame structure,the joint methods and construction technology of the two forms of the reserved post pouring notch of the main beam and the reserved post pouring section of the secondary beam when the main and secondary beams are prefabricated,as well as the construction technology when the main beam is cast-in-place and the secondary beam is prefabricated.The characteristics of the method and the difficult problems in construction are studied,and the solving measures are puts forward,so as to ensure the smooth construction of the main and secondary beams in the applied project.
关 键 词:装配式框架结构 主次梁节点 施工工艺 预留槽口 后浇段
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28