建筑工程总承包建设方式的问题及解决--以某国际总承包水泥厂项目为例  

Problems and Solutions of General Contracting Construction Mode of Construction Engineering---Taking an International General Contracting Cement Plant Project as an Example

在线阅读下载全文

作  者:张超 毕研强 吕强 ZHANG Chao;BI Yanqiang;LYU Qiang(North China Branch of China Construction Eighth Engineering Bureau,Tianjin,300450,China)

机构地区:[1]中建八局华北分公司,天津300450

出  处:《工程建设(维泽科技)》2021年第9期19-21,共3页Engineering Construction

摘  要:近年来,我国建筑市场迅猛发展,同时建筑工程数量也在逐年递增,建筑工程总承包项目管理过程中常遇到各类的问题,制约着我国建筑事业的发展.文章借助某国际总承包水泥厂项目从甲方、质量、进度、合约、成本方面总结分析总承包建设方式的利弊,并对问题提出了一些建议。In recent years,Chinese construction market has developed rapidly,and the number of construction projects is also increasing year by year.Various problems are often encountered in the management of general contracting projects of construction projects,which restrict the development of Chinese construction industry.With the help of an international general contracting cement plant project,this paper summarizes and analyzes the advantages and disadvantages of general contracting construction from the aspects of Party A,quality,progress,contract and cost,some suggestions are put forward.

关 键 词:国际总承包 成本管理 水泥厂 

分 类 号:TU723.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象