检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:祝亚峰 吴俊[1,2] 裴春明 秦金垒[1,2] 董一夫
机构地区:[1]南瑞集团(国网电力科学研究院)有限公司,江苏南京211000 [2]国网电力科学研究院武汉南瑞有限责任公司,湖北武汉430074
出 处:《科技创新与应用》2021年第26期86-88,共3页Technology Innovation and Application
摘 要:文章总结了EPC模式下输变电工程设计施工优化研究与实践的目的和意义。文章从工程成本、可研优化和各方有效互动三个方面阐述了设计及施工环节研究的重点。最后,文章结合数个输变电工程的建设实例,验证了EPC模式给输变电工程建设带来的增值。This paper summarizes the purpose and significance of the research and practice of design and construction optimization of power transmission and transformation projects under EPC mode.This paper expounds the key points of design and construction research from three aspects:project cost,feasibility optimization and effective interaction of all parties.Finally,based on several construction examples of power transmission and transformation projects,the paper verifies the added value brought by EPC mode to the construction of power transmission and transformation projects.
分 类 号:TB21[一般工业技术—工程设计测绘]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.255.182