检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周凯[1] 饶显杰 汪先进 谢敏 李明志 奚航 ZHOU Kai;RAO Xianjie;WANG Xianjin;XIE Min;LI Mingzhi;XI Hang(College of Electrical Engineering,Sichuan University,Chengdu 610065,China;Chengdu Power Supply Company,State Grid Sichuan Electric Power Company,Chengdu 610095,China;Wanzhou Power Supply Branch,State Grid Chongqing Electric Power Company,Chongqing 404100,China;Wuxi Power Supply Company,State Grid Jiangsu Electric Power Co.,Ltd.,Wuxi 214000,China;Skill Training Center of State Grid Sichuan Electric Power Company,Chengdu 611133,China)
机构地区:[1]四川大学电气工程学院,成都610065 [2]国网四川省电力有限公司成都供电公司,成都610095 [3]国网重庆市电力公司万州供电分公司,重庆404100 [4]国网江苏省电力有限公司无锡供电公司,无锡214000 [5]国网四川省电力公司技能培训中心,成都611133
出 处:《高电压技术》2021年第8期2946-2954,共9页High Voltage Engineering
基 金:国家自然科学基金(51477106)。
摘 要:电力电缆局部放电源定位是找出电缆局部缺陷的有效手段之一。为了解决传统互相关算法的定位结果受采样频率和电缆相速度频变特性影响大的问题,提出了一种基于距离的互相关算法用于电力电缆局放源定位。首先介绍了基于距离的互相关算法的基本原理,然后利用MATLAB建立了局放传播模型验证了该方法的有效性,研究了不同传播距离,不同采样频率和不同信噪比对定位精度的影响。最后利用振荡波测试平台对250 m的10 kV XLPE电力电缆进行局部放电试验,利用不同方法对局放信号进行定位,验证了该方法的优越性。仿真和实测结果表明,由于该互相关算法是直接以距离为自变量,不需要进行时延估计,因此该方法相较于传统的互相关方法具有更高的定位精度。Locating the partial discharge(PD)source in power cable is one of the effective means to diagnose the local defects of cables.The sampling rate and frequency characteristic of phase velocity have obvious influences on the localization accuracy of traditional cross-correlation algorithm,thus we put forward a distance-based cross-correlation algorithm to locate the partial discharge source in power cables.Firstly,the basic principle of the distance-based cross-correlation algorithm is introduced.Then,the simulations of PD signal are performed with the MATLAB software,and the validity of the algorithm is confirmed.The influences of different propagation distance,sampling rate and signals for noise ratio(SNR)on localization accuracy are studied.Finally,the advantages of the algorithm are showed by partial discharge test experiments,which are performed on a 250 m 10 kV XLPE power cable by using an oscillation wave test system.The simulation and experiment results show that the independent variable of the algorithm proposed in this paper is distance instead of delay time.Compared with traditional cross-correlation algorithm,the algorithm has a better locating result.
关 键 词:电力电缆 局部放电 互相关算法 定位方法 定位精度
分 类 号:TM855[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28