检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡伯[1] Hu Bo(Coal Industry Planning and Design Institute Corporation Ltd.,Beijing 100000,China)
机构地区:[1]煤炭工业规划设计研究院有限公司,北京100000
出 处:《煤炭与化工》2021年第8期28-29,119,共3页Coal and Chemical Industry
摘 要:红庆河煤矿是东胜煤田新街矿区特大型矿井,设计生产能力1500万t/a,为进一步扩大产能,使煤矿经济效益最大化,在对红庆河资源储量和生产系统能力分析的基础上,提出了4种扩能方案,通过分析对比,得到了通过再建新井的方式进行扩能为最佳方案的结论,并给出了再建新井的实施方案。Hongqinghe Mine is a large mine in Xinjie mining area of Dongsheng coal field,with a design capacity of 15 million t/a.In order to further expand the capacity and maximize the economic benefits of the mine,four options for capacity expansion were proposed based on the analysis of the resource reserves and production system capacity of the mine,and through analysis and comparison,it was concluded that the best option for capacity expansion was to build a new mine,and the implementation plan for building a new mine was given.The conclusion was that capacity expansion by constructing a new mine was the best option through analysis and comparison,with the implementation plan.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.252.174