检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:阮小峰[1] RUAN Xiaofeng(The Second Geological Prospecting Insitute of Henan,Zhengzhou Henan 450000,China)
机构地区:[1]河南省地矿局第二地质勘查院,河南郑州450000
出 处:《钻探工程》2021年第9期100-106,共7页Drilling Engineering
摘 要:高强预应力混凝土管桩(PHC)具有质量预可视、高强环保、施工高效灵活等特点,在目前雾霾严重的北方高层建筑施工中得到了广泛应用。本文通过河南某小区高层住宅楼管桩工程施工实例,介绍了管桩施工过程中由于施工、地层等原因造成的承载力不足问题,在采用低应变等常规检测手段无法准确判定原因的情况下,利用水下摄像技术准确判定问题所在,并采用复压、高强灌浆等方法处理的过程,为类似工程的处理提供一定的参考价值。High strength prestressed concrete pipe piles(PHC)have been widely used in the construction of high‑rise buildings in heavy‑haze shrouded northern China due to its features of pre‑visible quality,high‑strength,environmental protection,efficient and flexible construction.In reference to a field case of pipe pile construction for a high‑rise residential building in Henan province,this paper introduces the problem of insufficient bearing capacity caused by construction,stratum and other factors in the process of pipe pile construction;underwater photography technology used to accurately determine the problem while the conventional detection methods such as low strain cannot accurately determine the causes;and the treatment process of re‑pressing,high‑strength grouting and other methods.It provides can some reference for the treatment of similar projects.
关 键 词:高强预应力混凝土管桩 承载力不足 低应变检测 水下摄像 高强灌浆
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49