检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张文慧 Zhang Wenhui(Hebei Highway Engineering Quota Station,Shijiazhuang Hebei,050090,China)
机构地区:[1]河北省公路工程定额站,河北石家庄050090
出 处:《石家庄铁路职业技术学院学报》2021年第3期37-41,95,共6页Journal of Shijiazhuang Institute of Railway Technology
摘 要:依据交通运输部2018定额中人工工日单价的执行情况,调整河北省公路工程人工工日单价,为确定人工费、直接费提供依据。本文详细叙述了2018年新定额下河北省人工工日单价的测算过程,结合在建公路工程项目人工单价调查资料及公路工程项目概算样本测算对比,对人工单价结果进行合理性判断分析,为其它地区的人工单价测定提供一定的参考。According to the implementation of the unit price of workday in the 2018 quota of the Ministry of Transport,the unit price of workday of highway engineering in Hebei province is adjusted,in order to to provide a basis for determining labor cost and direct cost.This paper describes in detail the calculation process of labor day unit price in Hebei Province under the new quota in 2018.Combined with the investigation data of unit price of workday in highway engineering projects under construction and the calculation and comparison of budget estimate samples of highway engineering projects,this paper makes a reasonable judgment and analysis on the results of labor unit price,so as to provide a certain reference for the measurement of labor unit price in other regions.
分 类 号:TE834[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40