检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:巩维屏 李美玲 张石磊 GONG Wei-ping;LI Mei-ling;ZHANG Shi-lei(Inner Mongolia Yinchuo Jiliao Water Supply Co.,Ltd,Wulanhaote 137400,China)
机构地区:[1]内蒙古引绰济辽供水有限责任公司,内蒙古乌兰浩特137400
出 处:《中国农村水利水电》2021年第9期189-193,共5页China Rural Water and Hydropower
摘 要:多孔倒虹吸工程具有流量适应范围宽、调度灵活等优势,但闸孔调度过程中各孔间流量分配不均时将影响过流能力及流态,甚至出现因进口水位波动大而诱发结构振动。以某平原地区输水管道三孔倒虹吸工程设计研究为例,分析了多孔调度运行条件下进出口流态及水位波动特征,提出了调整进口流态及降低水位波动的优化措施,并探讨了糙率变化、下游渠末节制闸紧急关闭等因素对倒虹吸工程运行的影响。研究成果可为类似工程提供参考。The multi-hole inverted siphon project has the advantages of the large flow rate accommodation and flexible scheduling.However,the non-uniform flow distribution among the holes directly affects the flow capacity and the flow regime,and even the large water level fluctu⁃ations,which can induce engineering vibration.Taking a three-hole inverted siphon project of a water transmission pipeline in a plain area as an example,this paper emphatically analyzes the distribution of the flow regime in inlet and outlet and the characteristics of water level fluctuation under the condition of multi-hole scheduling operation.The optimization plans are proposed to adjust the flow regime in the inlet and reduce the water level fluctuation.The influence of the emergency closing of the valve and the variation of roughness on the operation of inverted siphon project is discussed.The results can provide a reference for similar projects.
分 类 号:TV672.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80