检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:南志军 Nan Zhi-jun
出 处:《建筑技术开发》2021年第18期33-34,共2页Building Technology Development
摘 要:某办公楼项目基础抗浮采用抗拔桩施工技术。从施工测量、泥浆制备、钢筋笼制作及吊装、护筒制作及埋设、钻机成孔、清孔、混凝土灌注、破除桩头等工序,详细叙述了抗拔桩全过程施工方法,尤其是设计标高以上竖向钢筋主筋安装PVC隔离套管,破除桩头效率大幅提高,实践表明这些施工方法取得了良好的实施效果,可为同类工程提供参考。Anti-floating foundation of an office building project adopts uplift pile.The construction method of the whole process of the uplift pile is described in detail from construction survey,mud preparation,reinforcement cage making and hoisting,protecting tube making and embedding,drilling hole making,hole cleaning,concrete pouring,breaking pile head and so on.The whole process construction method of uplift pile is described in detail,especially installation of PVC isolation sleeve for main reinforcement of vertical reinforcement above the design elevation,which greatly improves efficiency of breaking pile head.The practice shows that these construction methods have achieved good implementation effect and can provide reference for similar projects.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249