复合煤层露天矿综合开采工艺经济合理工作线长度优化  被引量:2

Economic and reasonable working line length optimization of combined mining technology in composite coal seam open-pit mine

在线阅读下载全文

作  者:陈晓杰 刘闯 张东旭 夏庆宇 CHEN Xiaojie;LIU Chuang;ZHANG Dongxu;XIA Qingyu(Xilinguole Alliance Wulantuga Coal Co.,Ltd.,Xilinhot 026000,China;Information Research Institute of Emergency Management Department,Beijing 100029,China;China Coal Technology and Engineering Group Shenyang Research Institute,Fushun 113122,China;State Key Laboratory of Coal Mine Safety Technology,Fushun 113122,China;Shenhua Sales Group Northeast Energy Trading Co.,Ltd.,Harbin 150000,China)

机构地区:[1]锡林郭勒盟乌兰图嘎煤炭有限责任公司,内蒙古锡林浩特026000 [2]应急管理部信息研究院,北京100029 [3]中煤科工集团沈阳研究院有限公司,辽宁抚顺113122 [4]煤矿安全技术国家重点实验室,辽宁抚顺113122 [5]神华销售集团东北能源贸易有限公司,黑龙江哈尔滨150000

出  处:《露天采矿技术》2021年第5期7-11,共5页Opencast Mining Technology

摘  要:对复合煤层露天矿综合开采工艺经济合理工作线长度进行了优化。计算了多种单一开采工艺条件下露天煤矿工作面运输成本,建立了复合煤层露天矿综合开采工艺开采模型,分析了露天煤矿工作线长度和生产剥采比的关系以及开采单位煤量的采排成本与生产剥采比的关系。以综合开采工艺系统的年采排费用与工作面运输费用总和最低为目标,给出了复合煤层露天矿综合开采工艺工作线长度优化确定方法,并通过工程实例研究验证了该方法的正确性和有效性。The economic and reasonable working line length of combined mining technology in composite coal seam open-pit mine is optimized,The article calculates the transportation cost of open-pit coal mine working face under various single mining technology conditions,establishes the combined mining technology mining model of composite coal seam open-pit coal mine,and analyzes the relationship between the working line length and the production stripping ratio of open-pit coal mine,as well as the relationship between the mining cost per unit coal volume and the production stripping ratio.In order to minimize the sum of the annual mining and drainage cost and the transportation cost of the working face of the combined mining technology system,the article gives an optimization method for determining the working line length of the combined mining technology of the composite coal seam open-pit mine,and verifies the correctness and effectiveness of the method by the engineering example study.

关 键 词:露天矿 综合开采工艺 工作线长度 优化 采排成本 

分 类 号:TD824[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象