检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢志伟 楼一江 XIE Zhiwei;LOU Yijiang(Zhejiang Huadong Construction Engineering Co.,Ltd.)
机构地区:[1]浙江华东建设工程有限公司,浙江杭州311122
出 处:《大坝与安全》2021年第3期12-15,25,共5页Dam & Safety
摘 要:地下洞室开挖后,在洞室围岩周围形成一定深度的松弛带,松弛带深度的确定对评价围岩稳定性和指导洞室支护设计都具有重要意义。基于白鹤滩水电站地下厂房开挖期间声波测试结果,分析地下厂房松弛与开挖深度、时间的关系,为指导施工开挖和岩体松弛加固设计提供依据。After the excavation of underground cavern,relaxation occurs in the surrounding rock of the cavern.Thus,determination of relaxation zone depth is important for evaluation of the stability of surrounding rock and for the design of tunnel support.In this paper,based on results of acoustic test during construction of underground powerhouse of Baihetan hydropower station,the relationship among rock relaxation,excavation depth and time is analyzed to provide basis for excavation and design of support.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.55.72