作 者:周彬彬 Zhou Binbin(Quality Supervision Station of Construction Engineering in Jiaozuo Mining Area of Coal Industry,Henan Jiaozuo 454002)
机构地区:[1]煤炭工业焦作矿区建设工程质量监督站,河南焦作454002
出 处:《山东煤炭科技》2021年第9期222-224,227,共4页Shandong Coal Science and Technology
摘 要:针对赵固一矿西风井井筒冻结段外壁的水文地质条件,在冻结表土层采用立井挖掘机配合中心回转抓岩机,冻结基岩层掘进采用伞钻打眼、光面爆破,试挖段采用短段掘砌混合作业,表土段采用立井冻结表土机械化快速施工法,井筒冻结基岩段外壁采用立井机械化快速施工。该分层施工技术可为其他类似矿井类似井筒施工提供参考。In view of the hydrogeological conditions of the outer wall of the frozen section of the Xifeng shaft in Zhaogu No.1 Coal Mine,the vertical shaft excavator and the central rotary rock grabber are used in the frozen surface soil layer,and the umbrella drill and smooth blasting are used in the freezing bedrock.The trial excavation section adopts the mixed operation of short section excavation,the surface soil section adopts the mechanized rapid construction method of vertical shaft frozen topsoil,and the outer wall of shaft frozen bedrock section adopts the rapid mechanized construction of vertical shaft.The layered construction technology can provide reference for similar shaft construction in other similar mines.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.36.48