检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔宇田 余扬 王坤 袁应飞 Kong Yutian;Yu Yang;Wang Kun;Yuan Yingfei(Powerchina Guiyang Engineering Co.,Ltd.,Guiyang 550081,Guizhou)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《陕西水利》2021年第9期154-157,共4页Shaanxi Water Resources
摘 要:在刚果(金)BSG水电站施工图设计阶段,本着技术可行、经济合理的原则,对引水系统的线路布置在纵向设计上进行优化设计,将竖井优化为斜井,在满足水力过渡过程计算的前提下,合理确定压力钢管起点高程,取得了较好的经济效益。In the construction drawing design stage of the BSG hydropower station in the Democratic Republic of the Congo,based on the principles of technical feasibility and economic rationality,the line layout of the water diversion system was optimized in the longitudinal design,and the vertical shaft was optimized into an inclined shaft.Under the premise,the starting point elevation of the penstock was reasonably determined,and good economic benefits were achieved.
分 类 号:TV732[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7