检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周剑波 杨子跃 徐鹏 Zhou Jianbo;Yang Ziyue;Xu Peng(China Construction Third Bureau Engineering Design Co.,Ltd.,Wuhan 430074)
出 处:《工程勘察》2021年第9期25-29,38,共6页Geotechnical Investigation & Surveying
摘 要:支护桩合理桩间距的确定对桩基支护工程安全性和经济性具有重要意义。在合理拱轴线的假定下建立了土拱力学模型,分析了土拱拱脚处的受力特征,推导建立了拱脚在极限平衡状态下土拱极限跨度表达式,在考虑土拱侧向压力的条件下,分析了土拱拱高随土层深度的演化规律,研究结果表明:土拱跨度随土体力学参数的增大而增大,随桩后水平推力的增加迅速减小,同时桩后土拱极限拱高随着土层深度的增加而减小。通过工程实例对比验证了关系式的合理性,研究结果对支护桩设计有一定参考价值。The rational pile spacing has significant influence on the safety and economy in the deep excavation supported by piles.A mechanical model of soil arching was created under the reasonable arching axis assumption,the mechanical characteristics of arch foot was analyzed,and the limit span of soil arch was calculated under ultimately balanced condition;the revolution of arch height with soil depth was analyzed in addition.The results shows that the limit arch span increases with the increase of soil strength,and decreases rapidly with the increase of horizontal force,while with the increase of depth,the limit arch height decreases.The rationality of the relation is verified by the comparison of projects,and the analysis results could be referred in the soldier pile design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.227.49.178