高原型山地风场35kV集电线路杆塔抗冰能力强化  

Enhancement of Ice Resistance of Poles and Towers of 35kV Collector in Mountain Wind Farm of Plateau Type

在线阅读下载全文

作  者:赵猛 张书晗 ZHAO Meng;ZHANG Shu-han(Yunnan Huadian Fuxin Power Generation Co.,Ltd.,Kunming 650228,China)

机构地区:[1]云南华电福新能源发电有限公司,云南昆明650228

出  处:《云南水力发电》2021年第9期38-39,共2页Yunnan Water Power

摘  要:云南某风电场35kVⅠ、Ⅱ回集电线路沿线海拔高程在2184~2536m之间,属于高原型山地风电场。经常受大风、低温阴雨等恶劣天气影响。该高原型山地风电场集电线自投产以来,在2016年1月及2018年2月出现过两次严重覆冰倒塔断线事故,已严重影响风电场安全稳定运行。因此提出倒塔断线原因分析并进行技术改造课题,从而提高35kV集电线路可靠性。The elevation along the 35 kV Ⅰand Ⅱ recombination lines of a wind farm in Yunnan is 2184-2536 m, which belongs to the plateau type mountain wind farm. It is often affected by bad weather such as strong wind, low temperature, rain and so on. Since the launch of the plateau-type mountain wind farm power collector, there have been two serious ice tower break accidents in January 2016 and February 2018, which have seriously affected the safe and stable operation of wind farm. Therefore, the cause analysis and technical renovation of broken tower line are put forward to improve the reliability of 35 kV power collection line.

关 键 词:结冰条件 倒塔、断线事故原因分析 技术改造 改造成果 

分 类 号:TK83[动力工程及工程热物理—流体机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象