基于IFS-动态加权的地下综合体深基坑施工风险评价  被引量:13

Risk assessment for the deep foundation pit construction of the underground complex based on the IFS-dynamic weighting

在线阅读下载全文

作  者:翟越[1] 汪铁楠 屈璐 汪班桥[1] 王康 ZHAI Yue;WANG Tie-nan;QU Lu;WANG Ban-qiao;WANG Kang(College of Geological Engineering and Geomatics,Chang'an University,Xi'an 710054,China;School of Safety Science and Engineering,Xi'an University of Science and Technology,Xi'an 710054,China)

机构地区:[1]长安大学地质工程与测绘学院,西安710054 [2]西安科技大学安全科学与工程学院,西安710054

出  处:《安全与环境学报》2021年第4期1389-1396,共8页Journal of Safety and Environment

基  金:中央高校基本科研业务费专项(300102269401);国家自然科学基金重大项目(41941019)。

摘  要:为控制地下综合体深基坑施工风险,提出了一种基于直觉模糊集(IFS)-动态加权的风险评价方法。从地质条件、建筑环境、岩土设计、施工方案和偶然风险5个方面分析地下综合体深基坑施工风险因素,构建了综合风险评价指标体系。采取施工风险5级划分方法,利用IFS理论确定指标风险;以偏大型正态加权函数确定指标权重,得到系统综合风险。以西安市某地下综合体深基坑施工实际为背景,进行方法应用。结果表明,该西安市地下综合体深基坑施工系统风险等级为显著风险。其中,指标“邻近建筑”“地下管网”的风险等级为高度风险,“道路交通”“基坑边坡稳定性”“降排水实施”为显著风险,对此提出了相应的安全措施。This paper intends to present a risk evaluation method based on the intuitionistic fuzzy set( IFS)-dynamic weighting approach to the construction risk control of the deep foundation pits of the underground complexes. To achieve the purpose, we would like to analyze the construction risk factors of such deep foundation pits and the comprehensive risk evaluation index system consisting of 5 aspects,that is,the geological conditions,the building environment,the geotechnical design,the construction plan and the accidental risk. And,secondly,we would like to determine the index risks to quantitatively describe the degree of ambiguity when decision makers make judgments by using the IFS,for it can help to make up for the shortcomings of the traditional subjective evaluation methods due to its lack of indefinite description of the decision-makers. And,thirdly,the paper has also proposed to adopt a 5-level division of construction risks to determine the index risk and the comprehensive risk of the deep foundation pit construction of the underground complexes based on the relevant domestic standards. And,fourthly,to highlight the difference between the qualitative and the quantitative changes of the indexes so as to describe the trend of the index weight with the growth of the index risks,in which the weight of the index tends to increase slowly with the increase of the index risk at the beginning,and,then,it may lead to fast growth,which tends in turn to get flat in the end with a large dynamic weighting function introduced. And,finally,the comprehensive risk of the deep foundation pit construction of the underground complexes can be accumulated. Thus,it can be seen that the method the paper has proposed can be applied to an actual construction case of the deep foundation pit of an underground complex in Xi’an.And,eventually,the results can be said inclined to reveal that its comprehensive risk level should be of great significance for rectification and control of the measures needed. Among the said indexes,the risk le

关 键 词:安全工程 地下综合体 深基坑 直觉模糊集 动态加权 

分 类 号:X947[环境科学与工程—安全科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象